The GC should hold an orientation meeting with the subcontractors to review the LEED responsibilities related specifically to their trades. This exercise helps to build trust and is crucial for obtaining buy-in from all participants in the process.
Revisit your baseline materials budget as the design evolves to make sure the numbers remain accurate and that you remain on track to achieve your goal for the credit.
When a product is made of multiple materials that are manufactured and extracted in different locations, or only part of the product can count as regional, use these special considerations.
How do you know how many regional materials you need to incorporate into your project? Look at the baseline material budget. Determine how much you want to spend on regional materials. Regionally manufactured materials purchases equal to 20% of the budget cost will give a project one point, and 10% manufactured and extracted regionally will give the project two points. Go through the project’s preliminary budget and identify what items are manufactured and harvested/extracted locally. Do these items add up to the amount needed to get one or two points?
How do you know how many regional materials you need to incorporate into your project? Look at the baseline material budget. Determine how much you want to spend on regional materials. Ten percent of the budget cost will give the project one point and 20% will give the project two points. Go through the project’s preliminary budget and identify specific items that are manufactured and harvested/extracted locally. Do these items add up to the amount needed to get one or two points?