You will also need to collect the following information in order to complete the calculations in the Credit Form. The following variables are used in the LEED Reference Guide and credit form.
N = Quantity of HVAC Equipment Type
Q = Cooling capacity of each equipment unit
Rc = Refrigerant Charge (pounds of refrigerant per ton of cooling capacity)
Lr = Annual leakage rate as a percentage of the equipment's full charge lost over a 12-month period (default value of 2.0%; minimum value of 0.5%).
If your building uses mechanical or mixed-mode ventilation, collect information on all base building systems that use refrigerants, including manufacturer, model number, installation date, refrigerant type, and amount used in the equipment.