Log in

You must design any BMPs to local standards that have adopted an 80% TSS removal rate criterion, or use existing data that has monitored the TSS removal rates of different stormwater controls.

You must design any BMPs to local standards that have adopted an 80% TSS removal rate criterion, or use existing data that has monitored the TSS removal rates of different stormwater controls.