Log in

Verify that the mechanical engineer and architect are comfortable with running the necessary calculations for background noise level and reverberation time (RT), and ensure that this analysis is included in their scope of work. If the architect and mechan

Verify that the mechanical engineer and architect are comfortable with running the necessary calculations for background noise level and reverberation time (RT), and ensure that this analysis is included in their scope of work. If the architect and mechanical engineer are not comfortable performing these calculations, hire an acoustics consultant as soon as possible.

Credits: 
Project phase: 
Credit tip type: