Unless following the "budget method" discussed above, check to make sure that the building footprint will allow the construction team to stay within the site disturbance parameters set forth in the credit language. You need to limit site disturbance to:40

Unless following the "budget method" discussed above, check to make sure that the building footprint will allow the construction team to stay within the site disturbance parameters set forth in the credit language. You need to limit site disturbance to:

  • 40 feet beyond the building perimeter;
  • 10 feet beyond surface walkways, patios, surface parking, and utilities less than 12 inches in diameter;
  • 15 feet beyond primary roadway curbs and main utility branch trenches;
  • and 25 feet beyond constructed areas with permeable surfaces such as pervious paving areas, stormwater detention facilities, and playing fields. (This larger buffer zone recognizes that these surface features may require wider staging areas to prevent compaction while they’re being built.)