Teams may use the energy end-use breakdown that is also required and facilitated through the ASHRAE Level I walk through assessment performed as a part of EAp1. If an alternative breakdown is utilized, ensure that the end uses correlate to the breakdown develop as a part of EAp1.
Credits:
Project phase:
Credit tip type: