Start the energy modeling by building the design-case model. Follow Section 11 (Energy Cost Budget) or Appendix G (Performance Rating Method) of ASHRAE 90.1-2007 guidelines for assistance with modeling parameters. Input the existing building’s envelope characteristics, but use project design specifications for energy-using equipment and systems.
Credits:
Project phase:
Credit tip type: