Previously developed sites typically comply with the requirements of this credit and are exempt from meeting the requirements of flood-plain and water-body setback requirements.
Previously developed sites typically comply with the requirements of this credit and are exempt from meeting the requirements of flood-plain and water-body setback requirements.