Previously developed sites typically comply with the requirements of this credit and are exempt from meeting the requirements of flood-plain and water-body setback requirements.
Project phase:
Credit tip type:
Previously developed sites typically comply with the requirements of this credit and are exempt from meeting the requirements of flood-plain and water-body setback requirements.