Prepare the documentation for submission to LEED Online. Documents should include:
- The brownfield designation by a local, state, or federal agency or a summary of the Phase II ESA, signed by a qualified environmental consultant, that outlines the type and amount of contamination and the remediation required to reduce the contamination to acceptable levels.
- A summary of the remediation plan and its implementation, signed by a qualified environmental consultant, that includes final measurements of contamination levels as compared to the initial maximum contaminant thresholds.
Project phase:
Credit tip type: