For Option 1: Equipment Efficiency & Appropriate Zoning and Controls, document the following:Section 1.4 - Upload a summary of load calculations for heating, cooling and fan sizing, including assumptions and results at full load and part load.Section

For Option 1: Equipment Efficiency & Appropriate Zoning and Controls, document the following:

  • Section 1.4 - Upload a summary of load calculations for heating, cooling and fan sizing, including assumptions and results at full load and part load.
  • Section 2.9 – Have your mechanical engineer sign off on the template that the efficiency requirements have been met. 
  • Section 3.10 – Fill out the template with the variable speed fans and pumps included in the project, their location, and design wattage demand at 50% of design flow. 
  • Appropriate Zoning – Indicate that all requirements for zoning have been met on the template. Also, include a narrative that describes the building-level HVAC system as well as that serving the tenant space, how the zones were determined, the control logic, as well as anticipated energy savings. 