For new construction, the combined cost of the installed equipment and the first year of monitoring is generally less than 1% of the total project cost for buildings larger than 150,000 ft2—and less than 1.5% for smaller buildings, according to studies.

For new construction, the combined cost of the installed equipment and the first year of monitoring is generally less than 1% of the total project cost for buildings larger than 150,000 ft2—and less than 1.5% for smaller buildings, according to studies.