For mechanically ventilated spaces, run ventilation calculations to verify that the final design meets the minimum outside air rates equal to or exceeding the ASHRAE 62.1-2007 minimum.
Project phase:
Credit tip type:
For mechanically ventilated spaces, run ventilation calculations to verify that the final design meets the minimum outside air rates equal to or exceeding the ASHRAE 62.1-2007 minimum.