Make sure the results fit the LEED Online submittal template requirements. For example, the unmet load hours have to be less than 300 and process loads will raise a red flag if they’re not approximately 25%. If any of the results are off mark, take time to redo the model. Time spent in design saves more later on in the LEED review process.
Credits:
Project phase:
Credit tip type: