Maintain a building operating plan (BOP) that establishes operating schedules and set points and regularly review these parameters against actual building needs. When developing these parameters, consider both time-of-day and time-of-year variations in optimal temperature requirements and be careful to avoid over-conditioning the building spaces with more ventilation, heating or cooling than is necessary.
Project phase:
Credit tip type: