Log in

It is unlikely that a simulation model will have been performed in the past for most existing buildings, and the cost associated with doing this solely to document the LEED credit would not be a wise expenditure. 

It is unlikely that a simulation model will have been performed in the past for most existing buildings, and the cost associated with doing this solely to document the LEED credit would not be a wise expenditure. 

Credits: 
Credit tip type: