Include goals for water-use reduction in the Owner’s Project Requirements (OPR) for EAp1: Fundamental Commissioning. Reduced use of hot water with efficient fixtures can save a lot of energy.
Credits:
Project phase:
Credit tip type:
Include goals for water-use reduction in the Owner’s Project Requirements (OPR) for EAp1: Fundamental Commissioning. Reduced use of hot water with efficient fixtures can save a lot of energy.