Log in

Include the following information on the LEED Online submittal template:Seasonal operating ranges to be maintainedA narrative describing the project’s approach to complying with       ASHRAE-55 including information about mechanic

Include the following information on the LEED Online submittal template:

  • Seasonal operating ranges to be maintained
  • A narrative describing the project’s approach to complying with       
  • ASHRAE-55 including information about mechanical systems, natural ventilation strategies and any special considerations.

Consider providing additional information about any of the variables that effected your calculations, including: 

  • Clothing Insulation and Metabolic Rate of building occupants
  • Weather design conditions used for peak load calculations
  • Hours per year that outdoor temperatures exceed design conditions
  • Maximum Design Humidity
  • Design Air Speed
  • Radiant temperature asymmetry
  • Vertical air temperature difference
  • Floor surface temperature
  • Draft.
Credits: 
Project phase: 
Credit tip type: