Include credit-related information in the Basis of Design for the commissioning credits EAp1 and EAc3. At a minimum this should include:that you require compliance with this credit;that you require compliance with ASHRAE-55;and what operating ranges shoul

Include credit-related information in the Basis of Design for the commissioning credits EAp1 and EAc3. At a minimum this should include:

  • that you require compliance with this credit;
  • that you require compliance with ASHRAE-55;
  • and what operating ranges should be maintained.