Include credit-related information in the Basis of Design for the commissioning credits EAp1 and EAc3. At a minimum this should include:
- that you require compliance with this credit;
- that you require compliance with ASHRAE-55;
- and what operating ranges should be maintained.
Project phase:
Credit tip type: