If your project does not meet all the criteria, check to see if the project footprint can be adjusted to avoid development in sensitive areas. For example, if a portion of your site is located within 100 feet of wetlands, do not develop on that portion of the site. Instead of having a larger building footprint, build up, with a smaller footprint.
Project phase:
Credit tip type: