If you are using energy modeling, get a final estimate of the cost based on final model outputs. Remember that this credit is based on the quantity of electricity consumption (usually in kWh), not cost.
Project phase:
Credit tip type:
If you are using energy modeling, get a final estimate of the cost based on final model outputs. Remember that this credit is based on the quantity of electricity consumption (usually in kWh), not cost.