If possible, develop the site master plan in conjunction with the current project design. This allows the design team to verify that both are being addressed and the proper credits are being incorporated.
Credits:
Project phase:
Credit tip type:
If possible, develop the site master plan in conjunction with the current project design. This allows the design team to verify that both are being addressed and the proper credits are being incorporated.