Identify the elements of the project that fall under this prerequisite: space cooling, space heating, lighting, ventilation, pumping, and domestic hot water. Do this by reviewing the requirements in ASHRAE 90.1-2007 and developing a building systems narrative for equipment and lighting.
Credits:
Project phase:
Credit tip type: