Log in

The general contractor should consider requiring subcontractors to revise and resubmit any submittals or shop drawings that do not have proper LEED credit documentation. Include this in contractual language. 

The general contractor should consider requiring subcontractors to revise and resubmit any submittals or shop drawings that do not have proper LEED credit documentation. Include this in contractual language. 

Credits: 
Project phase: 
Credit tip type: