Log in

Follow SMACNA strategies for HVAC protection that are appropriate to your project. These include items such as the following:wrapping ductwork and or ventilation equipment in plastic once it arrives on site;ordering ductwork pre-wrapped in plastic before

Follow SMACNA strategies for HVAC protection that are appropriate to your project. These include items such as the following:

  • This ductwork was ordered wrapped, and was stored away from construction work until installation.

    Photo – YRG Sustainability
    wrapping ductwork and or ventilation equipment in plastic once it arrives on site;
  • ordering ductwork pre-wrapped in plastic before it is delivered to the site;
  • placing ductwork or ventilation equipment in a room away from construction work to protect it from dust until it is installed and covered;
  • covering exposed grilles with plastic once ductwork is installed;
  • and laying plastic over underfloor air systems to keep out construction debris.
Project phase: 
Credit tip type: 
Image (landscape):