Log in

Fill out the LEED credit form, including equipment name, make or model, water usage, maximum allowable usage, and number of products installed. The designer needs to sign off confirming that no refrigeration equipment using potable water for once-through

Fill out the LEED credit form, including equipment name, make or model, water usage, maximum allowable usage, and number of products installed. The designer needs to sign off confirming that no refrigeration equipment using potable water for once-through cooling has been installed. 

Project phase: 
Credit tip type: