Energy savings are determined by comparing actual metered, or measured, energy use to the projected energy use of a baseline building under similar operating conditions.
- Energy Savings = Projected Baseline Energy Use – Post-Construction Energy Use (actual metered energy use).
- Post-Construction Energy Use is determined by utility metering or submetering, or by using an energy simulation model of the projected building.
Credits:
Project phase:
Credit tip type: