Develop a draft layout and identify potential fixtures. Even if the fixtures have not been finalized, develop calculations (see below) for the lighting power allowance and installed lighting power for the project to achieve at least a 15% reduction from the allowance. This provides a realistic target for your lighting designer to work toward.
Credits:
Project phase:
Credit tip type: