Log in

Develop all required documentation for LEED submittal, including floor plans indicating locations and lengths of entryway systems, wall details (for deck-to-deck partitions), mechanical drawings showing locations of designated exhaust systems, and mechani

Develop all required documentation for LEED submittal, including floor plans indicating locations and lengths of entryway systems, wall details (for deck-to-deck partitions), mechanical drawings showing locations of designated exhaust systems, and mechanical schedules specifying MERV 13 filtration. 

Project phase: 
Credit tip type: