Log in

Determine whether attempting EAc5.1, EAc5.2, or both is best for your project. Achieving both will earn your project a total of six points.  You can attempt one or both—neither is dependent on the other.EAc5.1: Measurement and Verification—Base Build

Determine whether attempting EAc5.1, EAc5.2, or both is best for your project. Achieving both will earn your project a total of six points.  You can attempt one or both—neither is dependent on the other.

  • EAc5.1: Measurement and Verification—Base Building develop an M&V program that measures the energy uses of the base building. If your project does not have any electrical equipment, it is ineligible for this credit.
  • EAc5.2: Measurement and Verification—Tenant Submetering you will only need to write an M&V plan for tenants to use and set up infrastructure, but don’t actually have to do any measurements —which is a good idea if your project will have LEED-CI tenants or if tenants plan to make energy improvements.
Credits: 
Project phase: 
Credit tip type: