Determine early on which of the two compliance paths is most feasible for your project. This will be determined by your project location. For projects that have the choice, Option 2 may be easier to document, although both options require developing a sit

Determine early on which of the two compliance paths is most feasible for your project. This will be determined by your project location. For projects that have the choice, Option 2 may be easier to document, although both options require developing a site plan and documenting the existing conditions of the surrounding area.

  • Option 1: Development Density is for project sites with a density of more than 60,000 square feet of built floor area per acre of land.
  • Option 2: Community Connectivity is for projects within a half-mile of a residential zone with an average density of 10 units per acre. 