Determine the best infrastructure for a metering network. The system must be installed in a central location and have the capability to expand to metering tenant spaces. Although for this credit you do not actually have to meter tenant spaces, you do need to provide the means for tenants to connect to the system. You’ll also need to include a section in the M&V plan on developing corrective actions if the measurements of tenants’ actual energy use differ from those predicted.