Log in

Design systems to collect data to support calculations (Option B) or calibration of simulations (Option D) from a combination of meters and sensors. These can be included in a building automation system or through temporary installation of additional sens

Design systems to collect data to support calculations (Option B) or calibration of simulations (Option D) from a combination of meters and sensors. These can be included in a building automation system or through temporary installation of additional sensors and data loggers as needed.

Credits: 
Project phase: 
Credit tip type: