This credit is generally a low- or no-cost credit. When it does add significant costs, that’s usually because it wasn’t considered early enough, so more equipment has to be added to provide, for example, additional dehumidification. An added cost like that could be prevented by designing the right system early in the schematic design.
Project phase:
Credit tip type: