The cost implications of this credit vary from one project to the next. Costs will depend on the complexity of the meter and sub-metering system, the cost of energy modeling and calibration, the cost of commissioning, and the size and complexity of the building. The cost premium for M&V will be lower for projects that already include a BMS.
- For retrofits, costs of M&V average no more than 5% of the total project cost, studies show.
- For new construction, the combined cost of the installed equipment and the first year of monitoring is generally less than 1% of the total project cost for buildings larger than 150,000 square feet, and less than 1.5% for smaller buildings, according to studies.