Log in

The civil engineer fills out the LEED documentation including a list of the BMPs used, descriptions of their function, expected annual percentage of rainfall infiltrated by each and a list of the structural controls used, descriptions of TSS removal perfo

The civil engineer fills out the LEED documentation including a list of the BMPs used, descriptions of their function, expected annual percentage of rainfall infiltrated by each and a list of the structural controls used, descriptions of TSS removal performance, and expected annual percentage of rainfall treated by each. The civil engineer should also provide a copy of the project plans with designated stormwater strategies, detailing where the BMPs or structural controls are located along with the area the serve. It’s helpful to include an optional narrative naming the local standard that the stormwater system is designed to match or surpass.

Project phase: 
Credit tip type: