Log in

The calculated weighted average for the project should not exceed 100: (LCGWP + LCODP x 105 ≤  100). See the credit language and LEED Online for additional detail on the formulas behind that calculation. 

The calculated weighted average for the project should not exceed 100: 

(LCGWP + LCODP x 105 ≤  100). See the credit language and LEED Online for additional detail on the formulas behind that calculation.

Project phase: 
Credit tip type: