A BMS typically includes some M&V capabilities. In buildings with these systems planned or already installed, the cost premium for M&V should be smaller than the percentages given above.
Credits:
Project phase:
Credit tip type:
A BMS typically includes some M&V capabilities. In buildings with these systems planned or already installed, the cost premium for M&V should be smaller than the percentages given above.