Log in

Ask the modeling consultant to develop an annual energy-use breakdown—in order to pick the “fattest” targets for energy reduction. A typical energy-use breakdown required for LEED submission and ASHRAE protocol includes: lighting;space heating;space

Ask the modeling consultant to develop an annual energy-use breakdown—in order to pick the “fattest” targets for energy reduction. A typical energy-use breakdown required for LEED submission and ASHRAE protocol includes: 

  • lighting;
  • space heating;
  • space cooling;
  • domestic hot water;
  • additional installed heat recovery, refrigeration, or heat-rejection systems;
  • ventilation fans and auxiliary pumps;
  • and equipment and plug loads. 
Credits: 
Project phase: 
Credit tip type: