Log in

 After completion of all construction activities, document credit compliance in LEED Online by uploading these documents: A narrative that declares the standard followed (2003 EPA CGP or local). If you used a local standard, write a narrative re

After completion of all construction activities, document credit compliance in LEED Online by uploading these documents: 

  • A narrative that declares the standard followed (2003 EPA CGP or local). If you used a local standard, write a narrative report detailing how it is equal to or more stringent than the CPG (Phases I and II, NPDES program). 
  • A written ESC plan or project drawings showing the control measures used.
Credits: 
Project phase: 
Credit tip type: