Forum
Forum » NC-v4.1 EQc5
Topic | Recent |
---|---|
Thermal Comfort Strategies for Factory Project: Leed Certification QueryNC-v4.1 EQc5: Thermal comfortposted by Alefiya Bhiwandiwala on Apr 25, 2024, 3:19 am
Hello everyone, We're currently working on a factory project that includes both... |
|
asking about thermal comfortNC-v4.1 EQc5: Thermal comfortposted by Nagaraj Sankar on Dec 16, 2022, 8:01 am
Hi all, In thermal comfort how can we achieve the 1 point by proving that controls (Air temperature, Air speed, Thermostat, operable windows) which we given in regular spaces in Both V4... Last reply: Nagaraj Sankar, Dec 18, 2022, 11:16 pm |
|
Thermal Comfort Design alternativeNC-v4.1 EQc5: Thermal comfortposted by SAMY Chamy on May 16, 2022, 11:54 pm
Dear Concern we are working with a huge process/manufacturing oriented project and it is very difficult to air condition the entire facility but we have a coditiont the office areas and... |