Better option for going into a LEED-CS Gold Certified BuildingCI-2009 SSc1: Site Selectionposted by Dean Barone on Dec 6, 2009, 5:47 am
Our client is going into a LEED Certified building and will automatically get 5 points. However, when we will look at Option 2 - we can achieve up to 12 points by meeting several path... Last reply: Derek Fung, Dec 6, 2009, 11:49 pm |
|
How exemplary do you have to be for Path 12?CI-2009 SSc1: Site Selectionposted by Tristan Roberts on Dec 11, 2009, 2:34 pm
The LEED Reference Guide seems to give conflicting advice on how to pursue Path 12 of this credit. On page 66, the basic description for Path 12 says that "the requirements of another LEED... Last reply: Anthony Brower, Sep 1, 2010, 6:15 pm |
|
Option 2: Path 8 and 7: No irrigation: 4 points?CI-2009 SSc1: Site Selectionposted by Andreas M. Roessler on May 25, 2010, 11:33 am
Hello, we are working on a project in Russia, where we don´t need any irrigation and we have only local plants. In the LEED template we can only upload information for path 8 (2 points). Is path... Last reply: Susann Geithner, Jul 23, 2012, 11:47 am |
|
Path 7 and 8: IrrigationCI-2009 SSc1: Site Selectionposted by Edwin Wealend on Jun 7, 2010, 9:54 pm
Hi, We are working on a project in China (using CI 2009), its a warehouse converted into an office. We are trying to gain credits from path 7&8, reduction of irrigation water,... Last reply: Rick Ferrara, Jun 7, 2010, 11:27 pm |
|
Can we pursue LEED CI?CI-2009 SSc1: Site Selectionposted by Joel Loes on Jun 17, 2010, 11:34 am
We are a general contractor, and these days we've been doing a lot of tenant improvements around the city. As a demonstration tool for what we're capable of, we'd like to pursue LEED CI... Last reply: Erin Cooper, Jul 15, 2010, 2:54 pm |
|
Help With SS Credit 1 Option 2 Path 6CI-2009 SSc1: Site Selectionposted by Ben Maxwell on Jul 27, 2010, 3:34 pm
I am currently trying to get a lighting design to comply with SS Credit 1 Option 2 Path 6 and have a question. To get this credit there is a stipulation that the "After-hours override maybe... Last reply: Rubén M. R., Feb 14, 2013, 1:44 pm |
|
SS credit 1: Option 2 pathCI-2009 SSc1: Site Selectionposted by Kevin Gilleran on Sep 8, 2010, 2:29 pm
Hi, Last reply: Kevin Gilleran, Sep 8, 2010, 3:47 pm |
|
50 % Pervious Pavement or Each Paver need to be 50% Pervious?CI-2009 SSc1: Site Selectionposted by Simon Sue on Sep 13, 2010, 3:57 am
Hi, when i look at SSC1 path 4, i keep asking the above question to myself, therefore, which one is the correct defination for "2. indentify all hardscape surfaces that are open... Last reply: Tristan Roberts, Sep 28, 2010, 11:26 pm |
|
Default value for open grid paver.CI-2009 SSc1: Site Selectionposted by Simon Sue on Sep 13, 2010, 3:59 am
Hi all, Last reply: Tristan Roberts, Sep 28, 2010, 10:16 pm |
|
SS1- Option 1- certified buildingCI-2009 SSc1: Site Selectionposted by R Jones on Sep 15, 2010, 10:20 am
has anyone had experience of achieving LEED CI SS1 via option 1 for the certified... Last reply: Susann Geithner, Mar 16, 2012, 12:59 pm |