Forum

Forum » CI-2009 MRc3.1
Topic

Determining Total Materials Budget

CI-2009 MRc3.1: Materials Reuse
posted by Adolfo Silva on Jun 24, 2010, 3:22 pm

We are working on a CI project which has a significant amount of reused construction materials and furniture.

Should we include the replacement cost or the actual cost of construction...

Last reply: David Posada, Jun 24, 2010, 5:44 pm

Re-used Food Service/Commercial Kitchen Equipment

CI-2009 MRc3.1: Materials Reuse
posted by Suzanne Painter-Supplee, LEED AP+ID&C on Oct 27, 2010, 8:09 pm

I have had conflicting information regarding re-used commercial kitchen equipment, whose energy and water are measured as 'process.' Some say yes, others no. There are mechanical, electrical and...

Last reply: Jack Boti, Jun 12, 2024, 10:14 am

Reclaimed White Oak for Materials Reuse

CI-2009 MRc3.1: Materials Reuse
posted by Alan Bernstein on Nov 29, 2010, 7:32 pm

I am using a reclaimed white oak...

Last reply: Tristan Roberts, Nov 29, 2010, 9:38 pm

Airport jetway re-use

CI-2009 MRc3.1: Materials Reuse
posted by Raphael Sperry on Feb 23, 2011, 6:41 pm

We have an unusual case in an airport project I am working on. It is LEED-CI as we are refurbishing a passenger concourse and some of the back-of-house spaces that go with it. There are 11...

Last reply: Eric Shamp, Feb 27, 2011, 11:25 pm

Manufacturer's Stockpile Material

CI-2009 MRc3.1: Materials Reuse
posted by Gary Keyfauver on Apr 10, 2011, 4:52 pm

I work for a major precast/prestressed manufacturer. Our products are always designed, manufactured and installed for each individual project. However, we sometimes have a few units sent to...

Last reply: David Posada, Apr 11, 2011, 12:45 pm

Duct Work

CI-2009 MRc3.1: Materials Reuse
posted by Holly Himes on Oct 5, 2011, 6:17 pm

I think I know the answer, but can duct work be counted towards material re-use? I think not as it is MEP material and if being used for the same function it doesn't meet the criteria of being...

Last reply: Peter Doo, May 7, 2012, 4:26 pm

Reusing salvaged on-site materials

CI-2009 MRc3.1: Materials Reuse
posted by Kathleen Burke on Feb 16, 2012, 8:17 am

can we use the salvaged materials from our site in another project site? For instance this is in a mall and they would uuse the ceiling tile from our project in another place in the mall?

Last reply: Kathleen Burke, Feb 16, 2012, 2:02 pm

MR3 or MR1.2?

CI-2009 MRc3.1: Materials Reuse
posted by Kenny Grossman on Mar 5, 2012, 5:45 pm

I've got a project where nearly nothing has changed between tenants. It seems that the interior materials would qualify for MR1.2 (where it would get two points for being over 60%), but I was...

Last reply: Susie Spivey-Tilson, Mar 12, 2012, 12:52 pm

Reclaimed Wood Reused for Restaurant Seating and Wall Panels

CI-2009 MRc3.1: Materials Reuse
posted by Abena Darden on Jun 21, 2012, 8:12 pm

We recently received a review back stating that the reclaimed...

Last reply: Abena Darden, Jun 21, 2012, 9:52 pm

Material Reused in another location

CI-2009 MRc3.1: Materials Reuse
posted by Sustentator Argentina on Oct 31, 2012, 3:09 pm

Hello. I have a question for something that I might be interpreting wrongly because of language. "Materiales Salvaged on site but reused in different-another location (can also count for MR2)"...

Last reply: Tristan Roberts, Nov 23, 2012, 10:21 pm
Post a question