Must have VAV system for Option 1?

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by Dave Intner on Feb 8, 2010, 5:30 pm

When we look into the LEED Reference Guide for Option 1, it seems to require a...

Last reply: Paul Conrad, Mar 31, 2011, 10:25 am

What if no fan/pump motors are greater than or equal to 5 hp?

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by Heather Langford on Feb 26, 2010, 9:57 am

Option 1 of this credit states that all motors 5 hp and greater must have VFDs that decrease fan power to 30%. If none of the installed fan motors are 5 hp or greater, can this credit be...

Last reply: Sunayana Jain, Jan 28, 2014, 3:05 pm

Applicability of CPG sections 2.9 and 3.10

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by Clark Denson on Feb 26, 2010, 10:08 am

Like Heather's question above, what if the equipment to be installed is less than 5 hp AND doesn't fall under the HVAC equipment categories listed in section 2.9 of the CPG, such as Variable...

Last reply: John Bauer, Jul 30, 2010, 2:53 pm

Base line consideration

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by Pierre Dammous on Apr 30, 2010, 10:24 am

What should we consider as baseline if we are replacing some of the HVAC equipments?

Last reply: Erik Dyrr, May 5, 2010, 6:05 pm

HVAC system Modulation

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by Pierre Dammous on Apr 30, 2010, 11:37 am

Considering a multi-zoning office with separate constant volume systems and zone control on every solar exposure, private office & special occupancies; can modulation of HVAC system in...

Last reply: amy amster, Jul 8, 2010, 9:13 pm

Clean room project

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by javier bolanos zeledon on Jul 30, 2010, 12:13 am

How can I model a clean room project where there is a lot of non process load in the HVAC. Can I assume HVAC as process load since it is not just for human comfort and is also for having the...

Last reply: Paul Conrad, Jul 30, 2010, 12:28 pm

Non-occupied Spaces

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by James Del Monaco on Aug 24, 2010, 6:42 pm

I'm working on a TI project where the tenant occupies 2 floors of an 8-story office building. I have an overhead...

Last reply: Paul Conrad, Aug 25, 2010, 9:55 am

Water Source Heat Pumps

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by Jonathon Pfantz on Sep 8, 2010, 11:16 am

I have a small project where the existing system in a 10 story building is a water source heat pump system. From what I gather, this type of system is not very friendly towards achieving LEED CI...

Last reply: Paul Conrad, Sep 8, 2010, 11:27 am

ASHRAE Interactive Forms for LEED Template

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by Jonathon Pfantz on Sep 16, 2010, 1:00 pm

Has anybody else had any problems using the ASHRAE 90.1-2007 Interactive Forms required for this credit when pursuing the building simulation option? The lighting form, for example, will not...

Last reply: Paul Conrad, Sep 21, 2010, 10:10 am

Part-load condition calculations using HAP

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by LarsonBinkley Employees on Sep 17, 2010, 3:36 pm

I am working on a small office space. I am trying to get 5 points for equipment efficiency. CPG section 1.4 indicates to provide calculations for part-load condition. It is not clear to me what...

Last reply: Rudolph Carneiro, Mar 19, 2013, 4:36 pm