For Option 1: Equipment Efficiency & Appropriate Zoning and Controls, document the following:Section 1.4 - Upload a summary of load calculations for heating, cooling and fan sizing, including assumptions and results at full load and part load.Section
For Option 1: Equipment Efficiency & Appropriate Zoning and Controls, document the following:
Section 1.4 - Upload a summary of load calculations for heating, cooling and fan sizing, including assumptions and results at full load and part load.
Section 2.9 – Have your mechanical engineer sign off on the template that the efficiency requirements have been met.
Section 3.10 – Fill out the template with the variable speed fans and pumps included in the project, their location, and design wattage demand at 50% of design flow.