Log in
Forum
Topic

Pc5- PrelIminary Project Planning

Pilot-Credits PC5: Preliminary Integrative Project Planning & Design
posted by John Drigot on Oct 19, 2010, 4:35 pm

The LEED Pilot Credit Library Webinar I participated in today was long overdue and much appreciated. I applied for the Pilot Credit program back on 11/18/2009 and it took until 8/6/2010 before...

Last reply: Teresa Cheung, Jan 11, 2011, 12:31 pm

LEED v4 rating systems being translated to Spanish

General forums
posted by Tristan Roberts on Oct 20, 2014, 12:29 pm

USGBC is translating the LEED v4 rating systems to Chinese, Portuguese, and Spanish, and they passed us an advance copy to get your feedback!
Here are the drafts for the Spanish translation...

Last reply: Marge Barradas Machin, Oct 29, 2014, 6:58 am

Single Ply Roof Membrane Adhesives

NC-2009 IEQc4.1: Low-emitting materials - adhesives and sealants
posted by Dwayne Wacenske on Jun 2, 2010, 2:33 pm

of you have seen this, but for those that are just referencing this forum thread related to roofing sealants, please see below information from the updated GBD&C 2009 addendum. All comments are dated...

Last reply: Tristan Roberts, Mar 29, 2011, 12:29 am

WFR question

CI-2009 IEQc8.1: Daylight and views - daylight
posted by cecilia uri on Jan 26, 2012, 6:05 pm

I am working on a project wehre the offices are bout 140 sq ft, the window is 5'x5' and the VLT is .70... I am not achieving the credit 8.1 with the prescriptive method...Do I use the full 100%...

Last reply: Jill Dalglish, PE, Feb 23, 2012, 3:15 pm

LCA Part A4 and A5 – Transport to site and Construction installa

NC-v4 MRc1: Building life-cycle impact reduction
posted by Petr Vogel on Dec 11, 2015, 10:06 am

already knows but for other forum users). Several European databases including Oekobau.dat, IBU, EPD Norge, Environdec, Spanish and soon also French databases are integrated into our One Click LCA platform....

Last reply: Panu Pasanen, Sep 25, 2016, 4:53 am

CEE Tier 3A Washer Requirement

NC-v4 WEp2: Indoor water use reduction
posted by Katie Herber on Jul 21, 2016, 3:10 pm

This prerequisite calls for all commercial washing machines to meet CEE Tier 3a, however the CEE website indicates that the commercial washing machine program is currently suspended in order to...

Last reply: marie-eve lachance, Jul 9, 2019, 6:02 am

Wet Applied Products- Adhesives & Sealants- Drywall Mud

NC-v4 EQc2: Low-emitting materials
posted by Kerry Honsinger on Aug 18, 2016, 3:43 pm

I believe drywall joint compounds and drywall finishing products (Mud) are considered Wet Applied Sealants. What Category do they fall under?

Last reply: Michelle Rosenberger, Oct 18, 2023, 12:50 pm

Locally Sourced materials definition

NC-v4 MRc3: Building product disclosure and optimization - sourcing of raw materials
posted by Elizabeth Kertesz on Nov 22, 2016, 4:46 pm

The reference guide says that products sourced (extracted, manufactured, purchased) within 100 miles of the site are valued at 200% of their cost. So, does this mean that a product has to be...

Last reply: Allison Smith, Aug 8, 2019, 12:33 pm

ASHRAE installations mandatory provisions in Major Renovations

NC-v4 EAp2: Minimum Energy Performance
posted by Alex Parella on Mar 30, 2017, 11:28 am

Dear all,

We intend to certify and existing office building, which is going to be retrofitted with the following criteria:

-No intervention in the envelope
-Partial...

Last reply: Marcus Sheffer, Feb 5, 2020, 1:19 pm

USGBC approved programs.

NC-v4 MRc2: Building product disclosure and optimization - environmental product declarations
posted by Samer Alhmdan on Jul 7, 2017, 2:25 am

Hello,
Where can I find a list for USGBC approved programs that certify products to get the point under option 2 -- Products that comply with other USGBC approved multi-attribute...

Last reply: riiupw rtooiek, Aug 5, 2020, 2:50 pm