Log in
Forum » CI-2009 EAc1.3
Loading...
Topic

Zoning in Retail

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by Jan Hesse on May 30, 2013, 1:38 am

I am working on an CI for Retail project. The Retail space will be included in an shopping mall and is three floors high. We have got one exterior fassade over all three floors (south), all...

Last reply: Jan Hesse, Jun 1, 2013, 3:06 pm

Partial Load Calculations & Fan Sizing

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by Nick Chiarelli on May 8, 2013, 6:35 am

Hello,

This project is 12 floors served by...

Last reply: Dylan Connelly, May 9, 2013, 9:29 am

EAc1.3 Simulation for LEED CI

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by Jimena Etchegaray on Apr 29, 2013, 5:24 pm

HELLO.
We have a project that will be applying for LEED certification under CI for Retail. This project is supermarket within a mall, the retail space is rented. We have the following...

Last reply: Marcus Sheffer, Apr 30, 2013, 10:00 am

Gas Rooftop HVAC

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by Kasandra Martin on Mar 12, 2013, 2:38 pm

Are there any guidelines with LEED CI for having gas fired rooftop hvac units?

Last reply: Tristan Roberts, Mar 26, 2013, 10:31 am

Do we need to document out of scope HVAC equipment?

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by Silvia Ruiz on Feb 26, 2013, 1:04 pm

I am working on a project where all of the AHUs, except for one, are provided by the building owner. Thus, the scope of work is limited to the provision of one...

Last reply: Dan LeBlanc, Mar 25, 2013, 6:54 pm

CAV- How to meet section 3.1 requirement

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by Srimannarayana NCVK on Mar 13, 2013, 12:23 pm

Hi,

For one of my LEED CI project, air distribution is a CAV system. There is a...

Last reply: Rudolph Carneiro, Mar 21, 2013, 1:39 pm

Part-load condition calculations using HAP

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by LarsonBinkley Employees on Sep 17, 2010, 3:36 pm

I am working on a small office space. I am trying to get 5 points for equipment efficiency. CPG section 1.4 indicates to provide calculations for part-load condition. It is not clear to me what...

Last reply: Rudolph Carneiro, Mar 19, 2013, 4:36 pm

Option 2- The Performance Rating Method

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by Emma Eliasson on May 31, 2012, 8:53 am

Hi,

LEED Reference Guide For Green Interior Design And Construction says in chapter EAc1.3 (# 6. Calculations) on p.168 that the standard has 2 energy comparison methods, both of which are...

Last reply: PAULA HERNANDEZ, Mar 19, 2013, 1:56 pm

LEED CI for Data center project

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by Lavanya Veerappa on Feb 11, 2013, 4:52 am

Hi,

A data centre project that i am working for is applying for LEED CI. We are planning to work on option 1 - prescriptive approach to meet enhanced energy performance.

We have...

Last reply: Amy Boyce, Mar 8, 2013, 10:05 am

Active control modulating the HVAC system as per space demand

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by Lavanya Veerappa on Feb 12, 2013, 4:51 am

Does that mean a dedicated...

Last reply: Marcus Sheffer, Feb 18, 2013, 9:42 am