Topic

pressure drop adjustemnt in the baseline model

CS-2009 EAp2: Minimum Energy Performance
posted by Agata Mozer on Aug 11, 2015, 7:04 am

I have two questiones:
1. Pressure drop adjustment for heat recovery in the baseline fan power calculations can be taken only if the heat recovery is modeled in the baseline case regardless...

Last reply: Marcus Sheffer, Aug 31, 2015, 9:57 am

G3.1.2.8 Design airflow rates

CS-2009 EAp2: Minimum Energy Performance
posted by Agata Mozer on May 6, 2015, 5:18 am

I have a question regarding section G3.1.2.8 of Appendix G. This section says that "design supply airflow rates for the baseline building design shall be based on a supply-air-to-room-air...

Last reply: Marcus Sheffer, Jun 11, 2015, 9:37 am

Bathtubs

EBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by Agata Mozer on Apr 28, 2015, 8:41 am

Dear All,
Our project is a high-class hotel. We are checking the compliance with WEp1 but we can't find what is the baseline for bathtubs.
Can we assume that tub is the same fixture...

Last reply: Trista Little, Apr 28, 2015, 10:59 am

anticipated annual total ongoing consumables purchases

EBOM-2009 MRc1: Sustainable Purchasing—Ongoing Consumables
posted by Agata Mozer on Apr 1, 2015, 9:15 am

In the Reference Guide on page 254 in Table 1. it's written that "Purchases of of ongoing consumables during the performance period must represent at least 5% (by cost) of documented or...

Last reply: Kimberly Schlaepfer, Apr 1, 2015, 1:19 pm

Eligibility for LEED- existing building structure

LEED Rating System Selection
posted by Agata Mozer on Mar 6, 2015, 4:58 am

forward. It would be benificial to all if you could post the USGBC response on this forum. Good Luck! Log in or register to post comments Melissa Merryweather Director Green Consult-Asia LEEDuser Premium...

Last reply: Melissa Merryweather, Mar 6, 2015, 9:09 pm

Petrol contamination

NC-2009 SSc3: Brownfield Redevelopment
posted by Alicja Bieszyńska on Jan 27, 2015, 3:06 pm

My project site is located next to one of the main arteries of Warsaw. Due to the high trafic the strip adjacent to the road is contaminated with petrol related substances (not much but still)....

Last reply: Susan Walter, Jan 28, 2015, 4:33 pm

Irrigation area

NC-2009 WEc1: Water Efficient Landscaping
posted by Alicja Bieszyńska on Jan 7, 2015, 10:19 am

If my project consists of 10,000sf of greenery but only 3,000sf is irrigated, do I need to insert 10,000sf or 3,000sf as a total area in the LEED Online form (both baseline and design case)?

Last reply: William Weaver, Jan 7, 2015, 10:34 am