Swimming Pools Baseline Definition

NC-v4 EAp2: Minimum Energy Performance
posted by Ricardo Sá on Feb 6, 2020, 4:57 am

Dear All,

we're currently certifying an hotel facility that includes indoor heated pools. In what relates to energy modeling, I have several questions I would like to see clarified...

Last reply: Marcus Sheffer, Feb 15, 2020, 6:01 pm

Does Hardware need to be included in the Walls category?

NC-v4 EQc2: Low emitting materials
posted by Renee Shirey on Feb 14, 2020, 2:33 pm

Since hardware (locksets, closers, kickplates) is installed on a door, and a door is part of the Walls category, is hardware required in the Walls category?  I am leaning towards 'Yes", but then...

Last reply: David Posada, Feb 14, 2020, 5:02 pm

Rainwater Management- No discharge at all or No immediate discharge?

NC-v4 SSc4: Rainwater management
posted by Junru Shen on Aug 8, 2018, 2:34 pm

Hi All, 

We are pursuing option 1 of the Rainwater management credit on our LEED v4 new construction project. I find that the credit requirement is not super clear on whether controlled...

Last reply: Vincent Pieri, Feb 14, 2020, 4:10 pm

LEED v4.1 Renewable Energy Production

NC-v4.1 EAc5: Renewable energy
posted by Ruju Rathod on Feb 13, 2020, 12:57 pm

We are evaluating the possibility of applying for the Renewable Energy Production credit under LEEDv4.1 for an office building that is receiving...

Last reply: Ruju Rathod, Feb 14, 2020, 1:55 pm

Green Cleaning policy pilot credit

Pilot-Credits IPpc88: LEED O+M Starter Kit
posted by Leilanie Bruce on Feb 14, 2020, 12:22 pm

I am  unable to find the Green Cleaning Policy Pilot Credit, under ID+C: CI. How do I register for this credit?

Last reply: Bipin Karki, Feb 14, 2020, 1:49 pm

Campus Shuttle Services- Not Counted

NC-v4.1 LTc5: Access to quality transit
posted by Levi Jimenez on Feb 13, 2020, 12:18 pm

We are in the process of developing a campus, quite substantial in size.  There is a train station with several train lines and two bus stops within a half mile, but not quite close enough in...

Last reply: Levi Jimenez, Feb 14, 2020, 12:25 pm

Baseline for Manufacturing facility energy usage...

NC-v4 EAc2: Optimize Energy Performance
posted by Rick Alfandre on Feb 10, 2020, 2:15 pm

We are dealing with a manufacturing facility that has energy intensive process loads.   Is there a standard way to establish a base case for manufacturing process loads?   

How does one...

Last reply: Marcus Sheffer, Feb 14, 2020, 12:23 pm

Problem with the LED lamp

NC-v4.1 EAp2: Minimum Energy Performance
posted by timmy lander on Feb 11, 2020, 3:46 am

There is a chandelier for four lamps - three in a circle and one in the center.

6-watt LED lamps are screwed into three plinths and a 10-watt...

Last reply: Marcus Sheffer, Feb 14, 2020, 12:22 pm

IES thermal block and baseline model with system 6

NC-v4 EAc2: Optimize Energy Performance
posted by on Jan 27, 2020, 8:30 pm

Dear all, 
I need your professional opinion about a project that I am currently working on.
The HVAC zones and zone groups tree is like: Group 1>A(5)>A.1(Master), A.2, A.3, A.4...

Last reply: Tyler Thumma, Feb 14, 2020, 12:02 pm

SCAQMD Exempt Compounds

CI-v4.1 EQc2: Low emitting materials
posted by Michelle Rosenberger on Jan 22, 2020, 1:57 pm

...

Last reply: Michelle Rosenberger, Feb 14, 2020, 11:57 am