Topic

PV installation built and commissioned prior to Occupancy

CI-v4 EAc4: Renewable energy production
posted by Gary Shlifer on Feb 19, 2019, 8:08 pm

Our project is a 6 story office building, 250,000 sq feet. It is underconstruction. The owner wishes to 'resurrect' a PV covered parking...

Last reply: Marcus Sheffer, Sep 3, 2019, 3:15 pm

Requirements for "Ongoing Feedback Mechanism"?

CI-v4 IPc1: Integrative process
posted by Renee Shirey on Aug 6, 2019, 7:23 pm

The requirement of "Briefly describe the planned method for gathering feedback on occupant satisfaction. Include information on sample sizes,

timing, and format." sounds an awful lot like...

Last reply: Marcus Sheffer, Sep 3, 2019, 3:08 pm

Modeling Proposed and Baseline buildings

CI-v4 EAp2: Minimum Energy Performance
posted by Ricardo Sá on Aug 1, 2019, 11:04 am

Dear All,

We are currently modelling a CI project. The...

Last reply: Marcus Sheffer, Sep 3, 2019, 3:00 pm

Mandatory Requirements and LEED

CI-v4 EAp2: Minimum Energy Performance
posted by Waleed AlGhamdi on May 29, 2018, 5:20 pm

Hi,

I'm faced with a new issue I haven't experienced in the past. I'm working on an energy model for a building in a state where the energy code is 90.1 2007, but is applying for LEED v4...

Last reply: Marcus Sheffer, Sep 3, 2019, 2:48 pm

Baseline Modeling

CS-v4 EAp2: Minimum Energy Performance
posted by Pan Pan on Jul 28, 2019, 1:11 am

Hi! According to appendix G if the system is 5 to 10, each floor must be modelled with a separate HVAC. Can I apply for exception, separate hvac system, if in a certain floor there are spaces...

Last reply: Marcus Sheffer, Sep 3, 2019, 2:36 pm

Motor Efficiency

NC-2009 EAp2: Minimum Energy Performance
posted by Osama Touni on Jul 22, 2019, 5:38 am

Hi everyone 

The motor of the fans in our project is Totally Enclosed Fan-non ventilated and i want to compare the efficiency with TABLE 10.8 in ASHRAE 90.1-2010, but the table mentioned ...

Last reply: Marcus Sheffer, Sep 3, 2019, 2:33 pm

Baseline system efficiency

NC-v4 EAp2: Minimum Energy Performance
posted by Isabel Santos on Jul 3, 2019, 2:17 pm

Hello everyone, 

I am modeling a baseline system No. 6 - Packaged...

Last reply: Marcus Sheffer, Sep 3, 2019, 2:27 pm

Multi Scene Control for Lighting

NC-v4 EAp2: Minimum Energy Performance
posted by Gabriela Crespo on Apr 18, 2016, 2:29 pm

Dear all,

We're working on a LEED v4 NC project in Mexico.
I am referring to Exceptions to 9.4.1.2b of standard ASHRAE 90.1-2010, where the automatic lighting shutoff control can be...

Last reply: Marcus Sheffer, Sep 3, 2019, 2:21 pm

Table 2 minimum compliance threshold

Schools-NC-v4 WEc2: Indoor water use reduction
posted by Bryna Dunn on Sep 3, 2019, 12:34 pm

I'm curious about whether other teams have had success with meeting the requirements of Table 2 in terms of the minimum amount of laundry that must be done per year to qualify for the point. ...

Master Site / Campus Innovation Credits

NC-v4 INc1: Innovation
posted by Adam Fitzpatrick on Aug 28, 2019, 3:12 pm

Can Innovation and/or Regional Priority credits be included in a campus master site submission?  Or must these credits be awarded at the project level?

Last reply: Deborah Lucking, Sep 3, 2019, 11:53 am