Waste Management Coordinator

NC-v4 MRp2: Construction and demolition waste management planning
posted by Akshay Padwal on Mar 5, 2019, 4:50 pm

The person (program manager) who is coordinating waste management, do they have to be LEED certified? 

Last reply: Nischay Gowda, Aug 7, 2019, 8:05 am

Location and Transportation- option 2: Diverse uses

LEED v4.1 Discussion Forum
posted by Ricardo Filho on Aug 7, 2019, 7:11 am

Hi all;

I have a question on the Location and Transportation credit, more specifically on the topic of the Diverse use:

the User guide says:

"No more than two uses in...

Requirements for "Ongoing Feedback Mechanism"?

CI-v4 IPc1: Integrative process
posted by Renee Shirey on Aug 6, 2019, 7:23 pm

The requirement of "Briefly describe the planned method for gathering feedback on occupant satisfaction. Include information on sample sizes,

timing, and format." sounds an awful lot like...

IEQc4.1 Required information

NC-2009 IEQc4.1: Low-emitting materials - adhesives and sealants
posted by Victoria Rios Esteve on Jul 24, 2019, 2:37 pm

Hi everyone! 

I´m pretty new at LEED certification process, so I will really appreciate your help. 

We are close to upload the construction submittal on a project we have been...

Last reply: Tricia Loe, Aug 6, 2019, 4:36 pm

1 EV charging station for 2 spaces and Vehicle Fueling Capacity per Station

CS-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehicles
posted by Edgar Arevalo on Aug 2, 2019, 2:01 pm

I was informed that the LEED project in question has 1 charging station and two reserved parking spots.  Am I to assume that this station has two charging cables, one for each spot, or should I...

Last reply: Edgar Arevalo, Aug 6, 2019, 4:12 pm

PV installation built and commissioned prior to Occupancy

CI-v4 EAc4: Renewable energy production
posted by Gary Shlifer on Feb 19, 2019, 8:08 pm

Our project is a 6 story office building, 250,000 sq feet. It is underconstruction. The owner wishes to 'resurrect' a PV covered parking...

Last reply: Amanda Tullos, Aug 6, 2019, 4:03 pm

EQpc44

Pilot-Credits EQpc44: Ergonomics approach for computer users
posted by Lou Niles II on Aug 6, 2019, 1:40 pm

We pursued this pilot credit on one of our interior projects and did well with only one set of comments. The review team seemed to not see that we had uploaded the required Registration and...

PV panels outside the Leed project boundary

NC-v4 EAc2: Optimize Energy Performance
posted by Stephan Zweig on Aug 5, 2019, 2:45 am

Hello to all Leed User community,

I have following question:

Is it possible for the credit Otpimize enetgy performance to count PV panels that are located outside the LPB?

As...

Last reply: Marcus Sheffer, Aug 6, 2019, 11:00 am

Increase of cost by percentage when applying LEM credits

NC-2009 IEQc4.1: Low-emitting materials - adhesives and sealants
posted by Claudio Leon on Aug 5, 2019, 12:02 pm

Hi all,

what would you estimate as a cost increase (percentage wise) in a project budget when applying all four LOW EMIITING MATERIAL credits for a multifamily midrise residential project...

LEED for Healthcare

NC-v4 EAp2: Minimum Energy Performance
posted by David Hubka on Jul 31, 2018, 4:39 pm

Hello Marcus,

Why is there a sliding scale for Healthcare as opposed to New Construction?

For example a New Construction project achieves 1 LEED point for demonstrating a 6%...

Last reply: David Hubka, Aug 5, 2019, 5:10 pm